Entry for torsdag maj 19, 2005

Mark attaches the sun shield "chin".
Barth and Marie (partially hidden) install the flight batteries.
Jeff gets checked out on the scissor lift, so that we can hold a dewar of liquid nitrogen in the beam as far away as possible.
Mark and Jeff measure the height of the extended lift.
Barth receives some pretty flowers from Mark. Looks like he forgot to water them, though.
Mark performs an indoor nitrogen-in-beam test. This is when we first discovered that something was not at all right.
A more direct test.
Testing the primary coverage.
A jury-rigged chopper. Liquid nitrogen is put in the styrofoam cup, which sits behind a rotating blade. The blade blocks the nitrogen from the detectors, so that the cold signal turns on and off repeatedly.
Ed, Don, and Jeff watch liquid helium boil off as it is purged from the dewar.
Still purging.